Description
Lyngso Marine UMS2100 Basic Alarm Panel, Industrial Automation Spare Part
Product Core Overview
The UMS2100 (also known under Sam Electronics / Atlas Elektronik) is the basic operator alarm panel for the Lyngso Stella 2100 UMS Universal Machinery Monitoring System, a classic marine unattended machinery space alarm system. It serves as the local HMI for watch officers on bridge, engine control room or accommodation, receiving alarm data from distributed I/O modules via RS485 bus. It supports alarm acknowledge, silencing, cut-out, alarm list browsing, deadman function, watch selection and printer output. It is widely fitted on cargo ships, tankers, container vessels and workboats to satisfy class UMS and watchkeeping requirements.The UMS2100 series is end-of-life; it is supplied as original surplus or fully tested refurbished spare for vessel retrofit and onboard maintenance.

UMS2100
Main Technical Specifications
| Item | Specification |
|---|---|
| Brand | Lyngso Marine (Sam Electronics / Atlas Elektronik) |
| Model | UMS2100 |
| Common Part Nos. | 970.400.410, 962.005.000, 271.148.556 |
| Series | Stella 2100 UMS Marine Alarm Monitoring System |
| Product Type | Basic Alarm Operator Panel / HMI |
| Display | Backlit LCD, 2 × 20 characters |
| Supply Voltage | 24 VDC, range 18–32 VDC |
| Communication | RS485 system bus, NMEA 0183 compatible |
| Alarm Output | Built-in audible horn, relay contact output |
| Max monitored channels | Up to 128 points with remote I/O expansion |
| Key Functions | Alarm accept, alarm silence, cut-out, deadman, watch duty, maintenance mode, print trigger |
| Front Protection | IP54 |
| Mounting | Panel cut-out mounting |
| Operating Temperature | 0 ℃ ~ +55 ℃ |
| Ambient Humidity | 5%–90% RH, non-condensing |
| Weight | Approx. 1.4–1.6 kg |
| Certification | Marine type approved (LR, DNV etc.) |
| Application | Ship engine room unattended machinery alarm, bridge / cabin watch alarm, machinery condition monitoring |
Quality Control Procedure
- Visual Incoming Inspection: Check LCD screen, membrane keypad, terminal block, bus connector, label, serial number and PCB condition.
- ESD Controlled Handling: All inspection and testing performed on grounded anti-static workstation with ESD wrist strap.
- Power-on Burn-in Test: 24VDC continuous energisation for 4 hours; check backlight, keypad response and temperature.
- RS485 Bus Communication Test: Connect to UMS 2100 CPU / ZM401 master module, verify alarm data reception.
- Keypad & Function Test: Test ALARM ACK, SILENCE, CUT-OUT, WATCH, DEADMAN and menu navigation.
- Buzzer & Relay Output Test: Verify horn sound and alarm relay switching.
- Firmware Compatibility Check: Confirm firmware revision matches the existing Stella 2100 system.
- Data Archiving: Record serial number and full test report, attach inspection sticker, vacuum anti-static packaging.
- Pre-shipment Audit: Double-check panel revision and part number before dispatch.
Recommended Related Models & Order Codes (15pcs)
- ZM401 CPU Master Module
- AEM402 Analog Input Module
- DMS401 Digital Input Module
- VM402 Relay Output Module
- SIM401 Signal Isolation Module
- UCS2100 Control System Panel
- 962.002.900 DMS/DPS 2100
- Watch cabin remote alarm panel
- RS485 shielded marine bus cable
- 24V marine power supply
- 810.001.210 Binary Relay Module
- 810.001.220 Binary I/O Module
- Printer interface module for alarm log
- Deadman extension unit
- Stella 2100 system power module
Frequently Asked Questions
Q1: Can UMS2100 from different revision replace each other directly?A: Hardware form factor is the same, but firmware and software revision must match the ZM401 master. Old Rev D and later Rev G are not always plug-and-play without system parameter check.
Q2: Is this panel discontinued?A: Yes, Lyngso Stella 2100 UMS platform is end-of-production. Vessel owners keep them as critical marine spares.
Q3: Does support hot swap while the UMS system is running?A: Power can be cut for replacement, but alarms will be lost on this panel during swap. The rest of the machinery monitoring system and other remote panels keep working. Class and chief engineer approval is required before replacement.
Q4: No alarm showing or communication fault after installation, what should I check?A: Check 24V supply polarity, RS485 A/B wiring, bus termination resistor, panel address setting, master ZM401 status and system configuration.
Q5: Warranty terms?A: Original surplus new: 12-month warranty. Refurbished tested stock: 6-month warranty. Damage caused by reversed power, bus overvoltage, keypad membrane tearing, ESD is excluded.
Q6: Commissioning software?A: Lyngso Stella 2100 configuration tool. Back up the alarm point list, panel address and system parameters before replacement.
Installation & Configuration Guide
Pre-installation Preparation
- Confirm cabin / ECR environment: low condensation, away from vibration and high-power cables; marine shielded wiring required.
- Prepare ESD protection, insulated screwdriver, 24VDC power, RS485 bus drawing and system parameter backup.
- Inform duty engineer, apply vessel work permit for UMS alarm system.
Installation Steps
- Cut off local 24V supply for this alarm panel.
- Remove old from panel cut-out, disconnect bus and power terminals.
- Unpack new spare under ESD protection; avoid scratching LCD and membrane keys.
- Fit new unit into cut-out, fix mounting clips.
- Wire 24VDC and A/B strictly per drawing; fit bus termination resistor at line end.
- Check chassis protective earth.
Configuration & Commissioning
- Power on, confirm LCD backlight and self-test run normally.
- Set panel address matching the original system setting.
- Verify communication with ZM401 master module.
- Trigger test alarms from I/O modules, confirm alarm indication, horn, acknowledge and cut-out functions.
- Test deadman, watch duty switching and alarm print function.
- Clear system alarms after self-diagnosis passes.
- Hand over to duty officer, confirm full UMS alarm function normal and save commissioning log.
Maintenance Notes
- Membrane keypad is consumable; avoid hard pressing and liquid splash.
- marine bus is sensitive to ground loop; single-point grounding for the bus shield.
- Keep spare panels stored in dry, shockproof anti-static packaging.
- Do not change panel address randomly; wrong address causes bus conflict and total alarm loss.
