Description

ELAU PacDrive MG3-1G-1G-PM SERCOS Gateway / Communication Module, Industrial Automation Spare Part

 

Product Core Overview

The MG3-1G-1G-PM is an ELAU (Schneider Electric) PacDrive MG3 series high-speed SERCOS communication gateway module. It acts as a bus converter and signal repeater within legacy PacDrive M servo systems, bridging between the motion controller and distributed servo drives or iSH axis networks. The suffix 1G-1G-PM defines dual fibre-optic SERCOS ports with PM fibre configuration.This module supports real-time synchronous motion data transmission for multi-axis applications such as packaging, converting and printing machines. It is factory end-of-life, stocked exclusively as maintenance spare for existing PacDrive installations. Hot replacement can restore SERCOS bus communication rapidly and minimise machine downtime during breakdowns.

 

Main Technical Specifications

MG3-1G-1G-PM

Item Specification
Brand ELAU (Schneider Electric)
Model MG3-1G-1G-PM
Series PacDrive MG3 SERCOS Gateway
Product Type Fibre Optic SERCOS Bus Repeater / Gateway
Port Configuration 2 × SERCOS fibre ports, PM fibre interface
Supply Voltage 24 VDC (±10% tolerance), reverse polarity protection
Bus Standard SERCOS II real-time motion bus
Transmission Medium Plastic-clad PM optical fibre
Cycle Time Compatible with standard PacDrive SERCOS sync cycle
Operation Temperature 0 ℃ ~ +55 ℃
Ambient Humidity 5%–90% RH, non-condensing
Protection Rating IP20 (cabinet internal mounting)
Mounting DIN rail mounting
Diagnostic Onboard status, link and fault LED indicators
Protection Overvoltage, undervoltage, ESD protection
Application PacDrive C400 / C600 / MAX / iSH servo systems, packaging, slitter, printing machinery

 

Quality Control Procedure

  1. Visual Incoming Inspection: Check housing, fibre transceiver sockets, 24V terminal block, label, serial number and casing integrity.
  2. ESD Controlled Handling: All inspection and testing performed on grounded anti-static workstation with ESD wrist strap.
  3. Power-on Burn-in Test: Energise 24VDC continuously for 4 hours; monitor LED status and temperature stability.
  4. Optical Link Test: Connect paired PM SERCOS fibre cables to verify transmit / receive link signal.
  5. System Bus Test: Integrate with PacDrive controller and servo drives, validate bus scanning and real-time communication.
  6. Compatibility Validation: Confirm firmware revision matches the original machine SERCOS topology.
  7. Data Archiving: Record serial number and full test report, attach inspection sticker, vacuum anti-static packaging.
  8. Pre-shipment Audit: Double-check full model suffix, fibre type (PM) and quantity before dispatch.

 

Recommended Related Models & Order Codes (15pcs)

  1. MG3-1G-1G-GM
  2. MG3-2G-2G-PM
  3. C400/A8/1/1/1/00
  4. C600/A8/0/1/0/00
  5. MAX-4/11/03/032/99/1/1/00
  6. iSHPS-5
  7. DB-5
  8. MC-4/11/05/400
  9. MC-2/11/05/400
  10. SH100/40060/0/1/00
  11. SH30701P02A2000
  12. SM-070/10/0/0/00
  13. SM-100/10/0/0/00
  14. SCL055
  15. SCL100

 

Frequently Asked Questions

Q1: Can MG3-1G-1G-PM replace MG3-1G-1G-GM directly?A: Same MG3 hardware platform; difference is fibre type (PM vs GM). Fibre cables must match the transceiver type. Mismatched fibre will cause SERCOS link failure.

Q2: Is this module discontinued?A: Yes, ELAU PacDrive MG3 series is end-of-life. Available stock is original surplus or fully tested refurbished spare parts.

Q3: Can I hot swap the MG3 gateway while the machine is running?A: Hot swap is not recommended. Perform LOTO procedure and cut off 24VDC supply before removal, otherwise SERCOS bus will drop and trigger axis faults.

Q4: Link fault LED illuminates after installation, what should I check?A: Verify PM fibre cable cleanliness, fibre direction (TX/RX cross), fibre damage, bus topology termination and SERCOS address configuration in PacDrive project.

Q5: Warranty terms?A: Original surplus new: 12-month warranty. Refurbished tested stock: 6-month warranty. Damage caused by wrong fibre type, miswiring, ESD or overvoltage is excluded.

Q6: Commissioning software?A: ELAU PacDrive Software (PDS). The existing SERCOS ring topology must be backed up before replacement.

 

Installation & Configuration Guide

Pre-installation Preparation

  • Confirm cabinet environment: clean, low dust, no condensation, separate from high-power inverters.
  • Prepare ESD protection, insulated screwdriver, matched PM SERCOS fibre cables and PacDrive project backup.
  • Back up the full SERCOS bus topology and axis parameters before removing the faulty gateway.

Installation Steps

  1. Execute LOTO lockout-tagout, cut off 24VDC control power of the MG3 module.
  2. Carefully unplug optical fibre connectors (do not touch the fibre end face), then disconnect 24V wiring. Release DIN rail latch and remove unit.
  3. Unpack new spare under ESD protection; keep fibre ports capped when unused to avoid contamination.
  4. Mount MG3-1G-1G-PM firmly on DIN rail and lock the latch.
  5. Wire 24VDC power supply, connect PM fibre cables strictly following TX-to-RX cross connection rules.
  6. Secure fibre routing, avoid sharp bending and excessive tension on optical fibres.
  7. Check terminal tightening and protective earth connection.

Configuration & Commissioning

  1. Restore 24VDC supply and observe front panel link LEDs.
  2. Open PacDrive Software and connect to the PacDrive motion controller.
  3. Scan the SERCOS ring, confirm all gateways, drives and axes are detected online.
  4. Verify bus topology, node address and communication cycle parameters match the saved project.
  5. Run manual jog test for each servo axis, check encoder feedback and motion response.
  6. Test electronic cam, flying shear and synchronisation functions under manual mode.
  7. Clear all residual alarms after system self-diagnosis passes.
  8. Switch machine back to automatic production mode and save commissioning log.

Maintenance Notes

  • Fibre end faces are extremely sensitive to dust and fingerprints; clean only with dedicated fibre cleaning tools.
  • Do not bend PM fibre below the minimum bend radius specified by ELAU.
  • Keep ventilation slots free of dust; overheating will cause intermittent SERCOS dropout.
  • Store spare modules in dry anti-static packaging with fibre port dust caps installed.